Construction Delay Expert Witnesses in Texas
The SEAK Expert Witness Directory contains a comprehensive list of construction delay expert witnesses who testify, consult and provide litigation support on construction delay and related issues. Construction delay expert witnesses and consultants on this page may form expert opinions, draft expert witness reports, and provide expert witness testimony at deposition and trial. The issues and subjects these construction delay expert witnesses testify regarding may include: Ada Trip And Fall, Building Code, Building Envelope, Construction Delay, Explosion, Foundation Movement, Post Tension & Precast Concrete, Retaining Wall, Roof & Building Collapse, Roofing, Stucco, Swimming Pool Safety, Water Intrusion, and Wind And Hail.
View Full Profile
Brian Huang, PE, SE, LEED AP
Structural Engineering Expert Witness
H2Y Consulting
Houston, Texas
Structural Engineering, Construction Defects
-
Building code, Building envelope, Retaining wall, Foundation movement, Water intrusion, Post-tension & Precast Concrete, Roof & Building collapse, Construction delay, ADA trip and fall, Swimming pool safety, Standard of care, Certificate of merit, Wind and hail, Roofing, Stucco, Explosion
Mr. Huang has over 25 years of expertise in research, design, and forensic analysis within the fields of structural
engineering and the building envelope industry. His professional background includes the structural design of new buildings, evaluation and design of renovation and repair projects, post-construction forensic assessments of structural and building envelope failures, and analysis of premises liability concerning code compliance.
In the realm of structural design, Mr. Huang's experience encompasses high-rise buildings, parking garages, tilt-up concrete,
and corporate office campuses. As a forensic engineering expert, he has conducted evaluations to provide professional opinions on the causes and origins of building damage and failures, including structural and retaining wall collapses, roof collapses, differential foundation movement, storm damage to various roofing materials, explosion and construction vibration damage,
seismic impacts, and building envelope failures.
...
You can also find Construction Delay Expert Witnesses in:
Alabama, Georgia, Pennsylvania, Tennessee, and Texas