Construction Delay Expert Witnesses
The SEAK Expert Witness Directory contains a comprehensive list of construction delay expert witnesses who testify, consult and provide litigation support on construction delay and related issues. Construction delay expert witnesses and consultants on this page may form expert opinions, draft expert witness reports, and provide expert witness testimony at deposition and trial. The issues and subjects these construction delay expert witnesses testify regarding may include: Construction Delay, Construction Claims, Construction Management, Explosion, Roofing, Acceleration, Ada Trip And Fall, Audit, Automotive, Building Code, Building Envelope, Building Envelope Specialist, Change Order Disputes, Change Orders, and Concurrent Delay.
View Full Profile
Hal K. Cain, PE
Cain and Associates Engineers and Constructors, Inc.
Mobile, Alabama
Construction, Engineering
-
Construction Delay, Forensic Engineering, Construction Defects, Construction Claims, Construction Management, Structural Engineer, Roof Consultant, Foundation Engineer, Building Envelope Specialist, EIFS, Scheduling Engineer, Planning Engineer, Mechanical Engineer
Experienced forensic engineer and construction claims expert with residential, commercial, and industrial experience. Capable of evaluating structural failures, construction defects and delay claims by contractors. Has firm with experts in mechanical engineering, electrical engineering, plumbing, HVAC, roofing and EIFS. Testifying experience in depositions and courtroom. Extensive experience in the engineering and construction of large industrial plants, both manufacturing and petrochemical type facilities.
View Full Profile
Caleb M. Sturm, PSP, CCP, CCA
Forensic Schedule/Delay and Damages Expert
BRG Global Construction Advisory & Disputes Practice
Florida
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
According to Lexology Index: Mr. Sturm is known for being "extremely competent, knowledgeable and reliable." Mr. Sturm excels in delivering clear, well-structured expert opinions in construction disputes, with his "great subject matter expertise" and "top quality work product," earning him recognition in arbitration and litigation proceedings."
Mr. Sturm has over 20 years of experience in the engineering and construction industry working in contractor, owner, and and expert consultant capacities. His expertise was developed while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting, job cost auditing, and the quantification of additional costs incurred.
Mr. Sturm has a de...
View Full Profile
Caleb M. Sturm, PSP, CCP, CCA
Forensic Schedule/Delay and Damages Expert
BRG Global Construction Advisory & Disputes Practice
Atlanta, Georgia
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
According to Lexology Index: Mr. Sturm is known for being "extremely competent, knowledgeable and reliable." Mr. Sturm excels in delivering clear, well-structured expert opinions in construction disputes, with his "great subject matter expertise" and "top quality work product," earning him recognition in arbitration and litigation proceedings."
Mr. Sturm has over 20 years of experience in the engineering and construction industry working in contractor, owner, and and expert consultant capacities. His expertise was developed while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting, job cost auditing, and the quantification of additional costs incurred.
Mr. Sturm has a de...
View Full Profile
Brian Huang, PE, SE, LEED AP
Structural Engineering Expert Witness
H2Y Consulting
Illinois
Structural Engineering, Construction Defects
-
Building code, Building envelope, Retaining wall, Foundation movement, Water intrusion, Post-tension & Precast Concrete, Roof & Building collapse, Construction delay, ADA trip and fall, Swimming pool safety, Standard of care, Certificate of merit, Wind and hail, Roofing, Stucco, Explosion
Mr. Huang has over 25 years of expertise in research, design, and forensic analysis within the fields of structural
engineering and the building envelope industry. His professional background includes the structural design of new buildings, evaluation and design of renovation and repair projects, post-construction forensic assessments of structural and building envelope failures, and analysis of premises liability concerning code compliance.
In the realm of structural design, Mr. Huang's experience encompasses high-rise buildings, parking garages, tilt-up concrete,
and corporate office campuses. As a forensic engineering expert, he has conducted evaluations to provide professional opinions on the causes and origins of building damage and failures, including structural and retaining wall collapses, roof collapses, differential foundation movement, storm damage to various roofing materials, explosion and construction vibration damage,
seismic impacts, and building envelope failures.
...
View Full Profile
Michael A. Pollock, P.E.
Cogent Experts, LLC
New Jersey
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
Registrations
• Professional Engineer: PA (PE075410)
• American Bar Association (ABA) – Construction Forum
• Environmental Protection Agency (EPA) Clean Air Act Certification – Universal (includes Chillers,
HVAC & Refrigeration)
• United States Patent & Trademark Office Registered (USPTO)
Professional Affiliations
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigeration, Air Conditioning Engineering (ASHRAE)
• American Arbitration Association (AAA)
• Certified Energy Manager (CEM)
• Product Developers and the Manufacturers Association PDMA
Supermarket Heating Ventilation, Air Conditioning & Refrigeration (HVACR) Matter – Florida - Provided expert witness field inspection and investigation of relevant HVACR and mechanical systems causing wet conditions via condensation. Guided counsel in deposition questions and developed the case strengths and weaknesses yielding a negotiated settlement favorable to our client.
Warehouse Distribut...
View Full Profile
Caleb M. Sturm, PSP, CCP, CCA
Forensic Schedule/Delay and Damages Expert
BRG Global Construction Advisory & Disputes Practice
North Carolina
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
According to Lexology Index: Mr. Sturm is known for being "extremely competent, knowledgeable and reliable." Mr. Sturm excels in delivering clear, well-structured expert opinions in construction disputes, with his "great subject matter expertise" and "top quality work product," earning him recognition in arbitration and litigation proceedings."
Mr. Sturm has over 20 years of experience in the engineering and construction industry working in contractor, owner, and and expert consultant capacities. His expertise was developed while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting, job cost auditing, and the quantification of additional costs incurred.
Mr. Sturm has a de...
View Full Profile
Michael A. Pollock, P.E.
Cogent Experts, LLC
Bryn Mawr, Pennsylvania
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
Registrations
• Professional Engineer: PA (PE075410)
• American Bar Association (ABA) – Construction Forum
• Environmental Protection Agency (EPA) Clean Air Act Certification – Universal (includes Chillers,
HVAC & Refrigeration)
• United States Patent & Trademark Office Registered (USPTO)
Professional Affiliations
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigeration, Air Conditioning Engineering (ASHRAE)
• American Arbitration Association (AAA)
• Certified Energy Manager (CEM)
• Product Developers and the Manufacturers Association PDMA
Supermarket Heating Ventilation, Air Conditioning & Refrigeration (HVACR) Matter – Florida - Provided expert witness field inspection and investigation of relevant HVACR and mechanical systems causing wet conditions via condensation. Guided counsel in deposition questions and developed the case strengths and weaknesses yielding a negotiated settlement favorable to our client.
Warehouse Distribut...
View Full Profile
Waine P. Hicks
Carriage House Custom Homes & Interiors, Inc.
Franklin, Tennessee
Construction, Construction Defects
-
Construction Claims, Roof Consultant, Construction Delay, Construction Management, Workmanship Claims, Change Order Disputes, Costs to Complete, Contract Disputes, Safety Issues, Design Build Claims, Construction Failures, Structural Failures, Construction Fault, Construction Expert
Waine Hicks is a Tennessee licensed General Contractor Commercial/Residential with over 50 years of construction and building experience. Waine provides a broad range of services to insurance companies and law firms as well as construction, engineering and architectural firms that includes structural analysis and design, condition assessment, damage investigations, failure analysis, construction consulting and management, and expert testimony for construction claims and disputes. Responsible for field investigations, establish and coordinate expert teams for investigations, provides quality assurance, evaluation and supervision of in-progress construction for residential and commercial structures.
Waine is a recognized expert in assessing, evaluating, remediating and testimony and is proven to be influential.
Certifications:
Certified Varco Pruden Design/Build Steel Buildings for Williamson, Maury, Dickson and Rutherford Counties/Middle Tennessee
• Certified General Contractor ...
View Full Profile
Brian Huang, PE, SE, LEED AP
Structural Engineering Expert Witness
H2Y Consulting
Houston, Texas
Structural Engineering, Construction Defects
-
Building code, Building envelope, Retaining wall, Foundation movement, Water intrusion, Post-tension & Precast Concrete, Roof & Building collapse, Construction delay, ADA trip and fall, Swimming pool safety, Standard of care, Certificate of merit, Wind and hail, Roofing, Stucco, Explosion
Mr. Huang has over 25 years of expertise in research, design, and forensic analysis within the fields of structural
engineering and the building envelope industry. His professional background includes the structural design of new buildings, evaluation and design of renovation and repair projects, post-construction forensic assessments of structural and building envelope failures, and analysis of premises liability concerning code compliance.
In the realm of structural design, Mr. Huang's experience encompasses high-rise buildings, parking garages, tilt-up concrete,
and corporate office campuses. As a forensic engineering expert, he has conducted evaluations to provide professional opinions on the causes and origins of building damage and failures, including structural and retaining wall collapses, roof collapses, differential foundation movement, storm damage to various roofing materials, explosion and construction vibration damage,
seismic impacts, and building envelope failures.
...
You can also find Construction Delay Expert Witnesses in:
Alabama, Georgia, Pennsylvania, Tennessee, and Texas