Cpm Scheduling Expert Witnesses

Cpm scheduling expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on cpm scheduling. The cpm scheduling expert witness listings on this page are typically from fields/areas of expertise such as: Construction, Construction Engineering, and Dispute Resolution.

Amy S Heine, PE, CCP, PSP

Hirschmugl, Heine & Associates, Inc

Mammoth Lakes, California
Construction Engineering, Construction - Construction Engineering, Forensic Schedule Analysis, Claim Preparation, CPM Scheduling, Design-Build, Strategic Project Planning, Primavera P6, Construction Impacts, Delay Analysis, Infrastructure, Heavy Civil, Tunnels
Ms. Heine holds a Master of Science degree in Civil Engineering from the University of Washington and a Bachelor of Arts degree in Economics from the University of California, San Diego. She is a licensed civil engineer in the states of California, Colorado, Maryland, Minnesota, and Wisconsin. She has over 25 years of experience in the construction industry working in numerous roles, such as Senior Project Engineer, Project Controls Manager, Project Engineer, Project Estimator and Project Manager. She currently serves as Principal and President of Hirschmugl, Heine & Associates, where she offers expert consulting and engineering services in the areas of planning and scheduling, temporary works design, claims consulting, and project management. Ms. Heine primarily works with Heavy Civil Contractors nationwide and has experience working on Federal, State and Local government Contracts. She has provided critical expert witness testimony on heavy civil projects in Utah, Washington D.C...

Caleb M. Sturm, PSP, CCP, CCA

Forensic Schedule/Delay and Damages Expert

BRG Global Construction Advisory & Disputes Practice

Tampa, Florida
Construction, Dispute Resolution - Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
Mr. Caleb M. Sturm has over 20 years of experience in the engineering and construction industry working as a contractor, owner, and an expert consultant. His experience was gained while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting and the quantification of additional costs incurred. Mr. Sturm has a demonstrable track record assisting parties in the successful resolution of claims prior to litigation or arbitration proceedings. Mr. Sturm can effectively collaborate with project personnel and perform analyses in the development of expert findings that are presented and relied upon during settlement conferences, formal mediations, meet and confer procedures, and inform...

Caleb M. Sturm, PSP, CCP, CCA

Forensic Schedule/Delay and Damages Expert

BRG Global Construction Advisory & Disputes Practice

North Carolina
Construction, Dispute Resolution - Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
Mr. Caleb M. Sturm has over 20 years of experience in the engineering and construction industry working as a contractor, owner, and an expert consultant. His experience was gained while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting and the quantification of additional costs incurred. Mr. Sturm has a demonstrable track record assisting parties in the successful resolution of claims prior to litigation or arbitration proceedings. Mr. Sturm can effectively collaborate with project personnel and perform analyses in the development of expert findings that are presented and relied upon during settlement conferences, formal mediations, meet and confer procedures, and inform...

Caleb M. Sturm, PSP, CCP, CCA

Forensic Schedule/Delay and Damages Expert

BRG Global Construction Advisory & Disputes Practice

Tennessee
Construction, Dispute Resolution - Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
Mr. Caleb M. Sturm has over 20 years of experience in the engineering and construction industry working as a contractor, owner, and an expert consultant. His experience was gained while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting and the quantification of additional costs incurred. Mr. Sturm has a demonstrable track record assisting parties in the successful resolution of claims prior to litigation or arbitration proceedings. Mr. Sturm can effectively collaborate with project personnel and perform analyses in the development of expert findings that are presented and relied upon during settlement conferences, formal mediations, meet and confer procedures, and inform...