Forensic Schedule And Delay Analysis Expert Witnesses

Forensic schedule and delay analysis expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on forensic schedule and delay analysis. The forensic schedule and delay analysis expert witness listings on this page are typically from fields/areas of expertise such as: Construction Defects and OSHA.

Amin Terouhid, Ph.D., PE, PMP, CFE

Adroit Consultants, LLC

Upper Saddle River, New Jersey
Construction Defects, OSHA - Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims. Served numerous times (in more than 100 cases) in the capacity of a consulting expert. Currently (Feb 2022) involved in one international arbitration case for a multimillion-dollar claim in the court of London and three other cases, including a construction delay and loss of productivity claim for a megaproject in New York, a construction injury case, and a slip and fall case in the United States. Licenses • Examined and certified as a Professional Engineer (P.E.) • Examined and certified by the Association of ...

Amin Terouhid, Ph.D., PE, PMP, CFE

Adroit Consultants, LLC

New York
Construction Defects, OSHA - Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims. Served numerous times (in more than 100 cases) in the capacity of a consulting expert. Currently (Feb 2022) involved in one international arbitration case for a multimillion-dollar claim in the court of London and three other cases, including a construction delay and loss of productivity claim for a megaproject in New York, a construction injury case, and a slip and fall case in the United States. Licenses • Examined and certified as a Professional Engineer (P.E.) • Examined and certified by the Association of ...

Amin Terouhid, Ph.D., PE, PMP, CFE

Adroit Consultants, LLC

Texas
Construction Defects, OSHA - Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims. Served numerous times (in more than 100 cases) in the capacity of a consulting expert. Currently (Feb 2022) involved in one international arbitration case for a multimillion-dollar claim in the court of London and three other cases, including a construction delay and loss of productivity claim for a megaproject in New York, a construction injury case, and a slip and fall case in the United States. Licenses • Examined and certified as a Professional Engineer (P.E.) • Examined and certified by the Association of ...