Critical Path Method Scheduling Expert Witnesses

Critical path method scheduling expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on critical path method scheduling. The critical path method scheduling expert witness listings on this page are typically from fields/areas of expertise such as: Construction and Construction Engineering.

View Full Profile

Larry W Cormicle, P.E.

Construction Expertise for 40 years

Cormicle Consulting Services, L.L.C.

Ames, Iowa
Construction Engineering, Construction - construction defects, construction schedule delays, construction contract disputes, construction methods and means, construction management, construction CPM scheduling, CPM scheduling, critical path method scheduling, construction standard of care, construction industry practices, construction manager at risk-Iowa
Mr. Cormicle has over 25 years of experience in general contracting, construction management, and real estate development, as well as over 30 years of experience as a professional construction engineering and management educator. Larry’s expertise in general contracting and construction management includes project engineering, project superintendent, project manager, senior project manager, owner’s agent, and owner’s representative. Larry’s first-person experience brings insight and credibility to his professional opinions. Mr. Cormicle is an Emeritus (retired) Teaching Professor of Construction Engineering at Iowa State University. Mr. Cormicle has a Master of Science in Civil Engineering from Iowa State University, with a specialization in Construction Engineering and Management. Mr. Cormicle is a licensed professional engineer in the State of Iowa in the branch of Construction Engineering for over 42 years.