Critical Path Method (Cpm) Expert Witnesses
Critical path method (cpm) expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on critical path method (cpm). The critical path method (cpm) expert witness listings on this page are typically from fields/areas of expertise such as: Construction, Construction Defects, Construction Engineering, and OSHA.
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Florida
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Georgia
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Walter Mcbrier
Construction Delay, CPM & Cost Expert Witness
GCM Group LLC
BOISE, Idaho
Construction, Construction Engineering
-
construction delay analysis, schedule analysis, forensic schedule analysis, Time impact analysis (TIA), Critical Path Method (CPM), Construction Claims, Change Order Disputes, Construction Cost Analysis, Cost Estimating, Project Controls, Project Scheduling, Construction Damages, Construction Litigation Support
Walter McBrier is a construction expert witness and Licensed Professional Engineer (P.E., Civil — Idaho) with nearly 25 years of hands-on construction experience. He founded GCM Group LLC on a single principle: Clarity Before Conflict.
His practice focuses on construction delay analysis, CPM schedule forensics, cost damages, change order disputes, differing site conditions, and expert testimony in state and federal litigation, arbitration, and mediation across the western United States.
What Makes GCM Group Different
When you retain GCM Group, you get Walter McBrier personally — not a junior analyst. Walter has been in the fire. As Vice President / Project Director at McAlvain Construction, he managed complex commercial projects, negotiated multimillion-dollar change orders, and worked through significant construction disputes from the inside. That lived experience allows him to read a project record the way only someone who has actually run jobs can.
His methodology is document...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Upper Saddle River, New Jersey
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
New York
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Texas
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...