Delay Claim Expert Witnesses
Delay claim expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on delay claim. The delay claim expert witness listings on this page are typically from fields/areas of expertise such as: HVAC and Plumbing.
Joseph A LaRovere, C.E.M.
HVAC, Plumbing, Engineering Expert - 35 Years
LaRovere Consulting, LLC
Cave Creek, Arizona
HVAC, Plumbing
-
HVAC, Plumbing, Mechanical, Chiller, Boiler, Air Handler, Heat Pump, Delay Claim, damage, leak, failure, water heater, flood, electrical, injury, engineer, heat exchanger, piping modification, litigation, explosion
35+ years of experience as a contractor, owner/operator, technician, and consultant to the construction industry with specialties in HVAC, Mechanical, Electrical, Plumbing, Energy Management and Control Systems. Licensed PE, Project Manager, Design Professional, Construction Manager on staff.
Specialties
HVAC Systems, air conditioning, heat pumps, chiller plants, heating hot water, boilers, air handlers, water source heat pumps, cooling towers, dedicated outside air, ventilation, and exhaust systems, Energy management and control system, sequence of operation, energy management and building efficiency, Domestic hot water systems, electric and gas boilers and water heaters, mixing valves and hot water recirculation systems, System failures, equipment failures, maintenance issues, preventative maintenance, water treatment, forensic investigation, and remediation, Project Management, Program Management, Project Accounting, and Scheduling consulting and analysis
Contractor Evaluation, ...